![]() |
| Center Row of Circles Finished Yesterday |
![]() |
| Everything Hanging Off the Front of the Frame is Neither Basted nor Quilted Yet |
![]() |
| Purple Background Quilted, but Haven't Touched the Geese Yet |
But it's totally worth it. I made the right choice in marking the entirety of the quilting design ahead of time, due to the scale of the design that I can only see small sections of in my workspace with the quilt on the frame. I am getting lots of practice quilting along straight and curved ruler edges. I'm also getting lots of practice traveling over previously stitched lines -- and a little bit of practice ripping out wobbly stitches that I couldn't live with.
Interestingly, the smaller size L bobbin on my APQS Millennium isn't annoying me as much with the slower pace of custom quilting as it did when I was quilting allover designs. Instead of running out of bobbin thread every 30 minutes, I'm quilting for hours before I need a new bobbin. I am using Glide 40 weight trilobal polyester thread in Violet for my top thread and prewound Magna Glide bobbins in the same color with this project.
One more thing I wanted to show you was my custom printed Spoonflower backing fabric, designed by Wren Leyland:
![]() |
| Check Out the Needle Holes in My Spoonflower Backing Fabric |
But now my coffee is done, an hour of quilting time has been gobbled up by this blog post, and that quilt ain't quilting itself up there!
My Tuesday To-Do is to finish ALL of the quilting on this project prior to the church staff meeting next Tuesday morning, and that includes those geese! Wish me luck!
I'm linking up with:
TUESDAY
· Colour and Inspiration Tuesday at http://www.cleverchameleon.com.au
· To-Do Tuesday at Stitch ALL the Things: http://stitchallthethings.com
WEDNESDAY
· Midweek Makers at www.quiltfabrication.com/
· WOW WIP on Wednesday at www.estheraliu.blogspot.com
THURSDAY
· Needle and Thread Thursday at http://www.myquiltinfatuation.blogspot.com/






